SABER Certificate for Steel Pipe Fittings
Steel pipe fittings need a SABER Product Certificate, and every shipment needs a SABER Shipment Certificate.

Overview
This page covers cast iron and steel pipe fittings, and plastic pipe fittings.
Steel pipe fittings fall under the Technical Regulation for Building Materials, Part 5: Tubes and Pipes for Water, Electricity and Gas Networks. Before the first shipment, an approved certification body reviews your test reports and issues a SABER Product Certificate. Each shipment then needs its own SABER Shipment Certificate before it can clear Saudi customs. Since 18 June 2026, your Saudi importer also needs an approved MIM Product Declaration for these codes before the shipment certificate can be issued.
Documents required
SABER certificate type: Type 3 (type approval plus production assurance). After type approval, your factory needs a certified product safety management system. The certification body visits the factory before approval, which lasts three years, and then carries out periodic and unannounced audits.
- Test reports for your steel pipe fittings
- Declaration of conformity
- Product details
- Photos of the product and labels
- Factory inspection documents
- MIM Product Declaration form
- Commercial invoice
- Packing list
This is our default preparation list. Actual requirements depend on the product, HS Code, applicable regulation, certification route and shipment details. We verify the list for your product before proceeding.
The market
Saudi Arabia imported US$395 million of steel and plastic pipe fittings in 2024. US$13 million came from India.
Source: UN Comtrade, HS 7307.19, 7307.99 and 3917.40, 2024
Find your HS code
Pipe fittings are coded by material.
How it works
Step 1
Confirm your product and code
Send us the product details and test reports. We confirm the right HS code and requirements.
Step 2
Get the product certificate
We help prepare the SABER product certificate application and the documents asked for.
Step 3
Ship with a certificate
For each shipment, we help with the SABER Shipment Certificate and your importer's declaration.
Request a quote
Tell us about your steel pipe fittings. You can review the prepared request and send it through WhatsApp.
Frequently asked questions
Do my fittings need the MIM Product Declaration?
Yes. These codes are on the MIM list, so your importer's declaration must be approved before the shipment certificate is issued.
Do flanges use these codes?
No. Flanges have their own code. See our steel flanges page.
Is the product certificate the same as the shipment certificate?
No. The product certificate covers your steel pipe fittings. The shipment certificate covers one shipment, so you need a new one each time you ship.
Do you provide the certificate?
Yes*. We help you get the certificates your product needs, from preparing the documents to the final approval.
Sources
- SABER HS code list (Technical Regulation for Building Materials, Part 5: Tubes and Pipes for Water, Electricity and Gas Networks) (opens in a new tab)
- SASO Technical Regulation for Building Materials, Part 5: Pipes used in Water, Electricity and Gas Networks (02-06-19-171), Art. 6/1: conformity assessment procedure (opens in a new tab)
- MIM circular on Product Declarations, 18 June 2026 (No public link; we hold an English translation.)